This is an old revision of the document!


WSRT stop day 14-11-2018 review meeting

Place: Muller room Date: 21-11-2018 10:30 Present: AS, RB, JK, RB, TG

Subjects

Progress overview method

ZFS update issues

ZFS not part of kernel. When using kdms, a manual rebuild action is required. When using kmod this should work more smoothly. Before the stopday: Test an update a CentOS hypervisor (wop61)

Matplotlib update

The Matplotlib update was postponed (not well tested). Was updated later (20-11-2018)

Stop virtualbox

Virtualbox should be stopped on alta2 before updates start

GPG keys

All GPG keys should be in place before updates start (Ubuntu)

Test spare LCU

Lcu-rt0 became lcu-rt6. Several adjustments needed (casacore,pyrap). Supervisor status was not updated in Zabbix. Note we were waiting for a new release.

Inform Apertif users

Use apertif_users@astron.nl for communication with users. Add RO admins too.

Supervisor on LCU's crashes

Supervisor starts too early, should wat for NFS. Fixed a few days later by Teun.

Update order

Reinoud: Wait with update of the ZFS replica servers before production is ready. Put proper order in procedure!

Jenkins slaves not tested

Arno: Our checklist went well. What was missing was: check if Jenkins slaves are up. (The home of Jenkins was moved) Alta: Ingest not configured properly. Test for apertif→ alta was not present.

Stopday duration

Arno: We expect 1 whole day for the sysadmin and the next morning for completion of the tests.

Spacealk update

Jasmin: Spacewalk host Wop76 needs to be updated before its hypervisor


QR Code
QR Code public:stopday_141118_review (generated for current page)