Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
public:stopdayactivities_160221 [2021/02/10 15:30] – [Actions] klipicpublic:stopdayactivities_160221 [2021/02/15 16:12] (current) – [WSRT stop-day activities Feb 2021] greenwood
Line 1: Line 1:
-====== WSRT stop-day activities Dec, 2020 ======+====== WSRT stop-day activities 16 Feb 2021 ======
  
 \\ \\
  
 ^ Coordinator | Walter | roadmin@astron.nl | ^ Coordinator | Walter | roadmin@astron.nl |
-^ Software Support |    +^ Software Support | n/a n/a  
-^ Science, Operations and Support | Manu |orru@astron.nl |  +^ Science, Operations and Support | Manu Orru |orru@astron.nl |  
-^ Observer | ask Observing team  | observer@astron.nl |+^ Observer | Jurjen Sluman  | observer@astron.nl |
  
 ==== Actions ==== ==== Actions ====
  
   * Operator will stop Apertif software before 08:00   * Operator will stop Apertif software before 08:00
-  * Update & reboot (do not reboot before network change) of all systems (incl LCU's and both data writers) (Walter and Jasmin)[[https://docs.google.com/spreadsheets/d/1kub84wpTDOCPX8R2JrnqcYl2x1kxKTh0R3BuVgqIrCE/edit#gid=14436476|System Overview]] +  * Update & reboot (do not reboot before network change) of all systems (incl LCU's and both data writers) (Walter and Jasmin)[[https://docs.google.com/spreadsheets/d/1kub84wpTDOCPX8R2JrnqcYl2x1kxKTh0R3BuVgqIrCE/edit#gid=515470835| System Overview]] 
  
  
 Note: Note:
   * Spacewalk VM will be updated before stop-day (Walter)   * Spacewalk VM will be updated before stop-day (Walter)
-  * Test update of lcu-rt0,dop70,wop78 before the stop-day (Walter)+  * Test update of lcu-rt0, dop70, wop78 before the stop-day (Walter)
   * Test update of hypervisor wop85 (ZFS/KVM) before the stopday (Walter)   * Test update of hypervisor wop85 (ZFS/KVM) before the stopday (Walter)
   * Stop Virtual-box on alta2 before you start updating  / rebooting (Jasmin)   * Stop Virtual-box on alta2 before you start updating  / rebooting (Jasmin)
-  * Network change (ip/subnet) (before reboot)(Jasmin)+  
  
  
  
-==== Results ====+==== Stop Day Procedure ====
  
-The results can be found in [[https://docs.google.com/spreadsheets/d/1kub84wpTDOCPX8R2JrnqcYl2x1kxKTh0R3BuVgqIrCE/edit#gid=14436476|this Google Spreadsheet]] 
  
  

QR Code
QR Code public:stopdayactivities_160221 (generated for current page)