Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
public:stopdayactivities_130421 [2021/04/01 08:15] greenwoodpublic:stopdayactivities_130421 [2021/04/19 09:58] (current) – [Actions] greenwood
Line 6: Line 6:
 ^ Software Support | n/a | n/a  | ^ Software Support | n/a | n/a  |
 ^ Science, Operations and Support | Manu Orru |orru@astron.nl |  ^ Science, Operations and Support | Manu Orru |orru@astron.nl | 
-^ Observer | ?  | observer@astron.nl |+^ Observer | Jurjen Sluman   | observer@astron.nl |
  
 ==== Actions ==== ==== Actions ====
  
-  * Operator will stop Apertif software before 08:00 +  * Operator will stop Apertif software before 08:00 LT 
-  * Update & reboot (do not reboot before network change) of all systems (incl LCU's and both data writers) (Walter and Jasmin)[[https://docs.google.com/spreadsheets/d/1kub84wpTDOCPX8R2JrnqcYl2x1kxKTh0R3BuVgqIrCE/edit#gid=515470835| System Overview]] +  * Update & reboot of all listed WSRT and DWG systems (Walter and Teun)[[https://docs.google.com/spreadsheets/d/1kub84wpTDOCPX8R2JrnqcYl2x1kxKTh0R3BuVgqIrCE/edit#gid=515470835| WSRT Stop day checklist and System Overview]]  
 +  * ALTA systems update and reboot (Mike)
  
  
 Note: Note:
-  * Spacewalk VM will be updated before stop-day (Walter) +  * Spacewalk VM (wop76) will be updated before stop-day (Walter) 
-  * Test update of lcu-rt0dop70, wop78 before the stop-day (Walter) +  * Perform update of test systems: dop375, dop445dop818, wop78 before the stop-day (Walter) 
-  * Test update of hypervisor wop85 (ZFS/KVM) before the stopday (Walter) +  * Perform update of test hypervisors: dop212, wop85 (ZFS/KVM) before the stopday (Walter) 
-  * Stop Virtual-box on alta2 before you start updating  rebooting (Jasmin)+  * Stop Virtual-box on alta2 before starting update/reboot (Mike)
      
  

QR Code
QR Code public:stopdayactivities_130421 (generated for current page)