Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
public:stopdayactivities_130421 [2021/04/01 08:14] – created greenwood | public:stopdayactivities_130421 [2021/04/19 09:58] (current) – [Actions] greenwood | ||
---|---|---|---|
Line 6: | Line 6: | ||
^ Software Support | n/a | n/a | | ^ Software Support | n/a | n/a | | ||
^ Science, Operations and Support | Manu Orru |orru@astron.nl | | ^ Science, Operations and Support | Manu Orru |orru@astron.nl | | ||
- | ^ Observer | ? | + | ^ Observer | Jurjen Sluman |
+ | |||
+ | ==== Actions ==== | ||
+ | |||
+ | * Operator will stop Apertif software before 08:00 LT | ||
+ | * Update & reboot of all listed WSRT and DWG systems (Walter and Teun)[[https:// | ||
+ | * ALTA systems update and reboot (Mike) | ||
+ | |||
+ | |||
+ | Note: | ||
+ | * Spacewalk VM (wop76) will be updated before stop-day (Walter) | ||
+ | * Perform update of test systems: dop375, dop445, dop818, wop78 before the stop-day (Walter) | ||
+ | * Perform update of test hypervisors: | ||
+ | * Stop Virtual-box on alta2 before starting update/ | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ==== Stop Day Procedure ==== | ||
+ | |||
+ | |||
+ | |||
+ | :!: The stop-days procedure can be found [[engineering: | ||