Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
public:stopdayactivities_121021 [2021/09/21 14:49] – [Actions] greenwood | public:stopdayactivities_121021 [2021/11/24 09:15] (current) – [WSRT stop-day activities 23 November 2021] greenwood | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== WSRT stop-day activities | + | ====== WSRT stop-day activities |
\\ | \\ | ||
- | ^ Coordinator | Walter | + | ^ Coordinator | Jasmin |
^ Software Support | n/a | n/a | | ^ Software Support | n/a | n/a | | ||
^ Science, Operations and Support | Manu Orru |orru@astron.nl | | ^ Science, Operations and Support | Manu Orru |orru@astron.nl | | ||
^ Observer | Richard Blaauw | ^ Observer | Richard Blaauw | ||
+ | Due to pre-existing VLBI observations, | ||
==== Actions ==== | ==== Actions ==== | ||
- | * Operator will stop Apertif software before 08:00 LT | + | * ✔ Operator will stop Apertif software before 08:00 LT |
- | * Update & reboot of all listed WSRT and DWG systems (Walter and Jasmin)[[https:// | + | * ✔ Update & reboot of all listed WSRT and DWG systems (Walter and Jasmin)[[https:// |
- | * [[https:// | + | * |
+ | * ✔ [[https:// | ||
Note: | Note: | ||
- | * Spacewalk | + | * ✔ Uyuni VM (dop486) will be updated before stop-day (Jasmin) |
- | * Perform update of test systems: dop375, dop445, dop818, wop78 before the stop-day (Walter) | + | * ✔ Perform update of test systems: dop375, dop445, dop818, wop78 before the stop-day (Jasmin) |
- | * Perform update of test hypervisors: | + | * ✔ Perform update of test hypervisors: |