Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
public:stopdayactivities_121021 [2021/09/20 12:09] – [Actions] greenwoodpublic:stopdayactivities_121021 [2021/11/24 09:15] (current) – [WSRT stop-day activities 23 November 2021] greenwood
Line 1: Line 1:
-====== WSRT stop-day activities 12 October 2021 ======+====== WSRT stop-day activities 23 November 2021 ======
  
 \\ \\
  
-^ Coordinator | Walter | roadmin@astron.nl |+^ Coordinator | Jasmin | roadmin@astron.nl |
 ^ Software Support | n/a | n/a  | ^ Software Support | n/a | n/a  |
 ^ Science, Operations and Support | Manu Orru |orru@astron.nl |  ^ Science, Operations and Support | Manu Orru |orru@astron.nl | 
 ^ Observer | Richard Blaauw    | observer@astron.nl | ^ Observer | Richard Blaauw    | observer@astron.nl |
  
 +Due to pre-existing VLBI observations, this stop-day has been rescheduled in November. 
 ==== Actions ==== ==== Actions ====
  
-  * Operator will stop Apertif software before 08:00 LT +  * ✔ Operator will stop Apertif software before 08:00 LT 
-  * Update & reboot of all listed WSRT and DWG systems (Walter and Jasmin)[[https://docs.google.com/spreadsheets/d/1kub84wpTDOCPX8R2JrnqcYl2x1kxKTh0R3BuVgqIrCE/edit#gid=73826342| WSRT Stop day checklist and System Overview]] +  * ✔ Update & reboot of all listed WSRT and DWG systems (Walter and Jasmin)[[https://docs.google.com/spreadsheets/d/1kub84wpTDOCPX8R2JrnqcYl2x1kxKTh0R3BuVgqIrCE/edit#gid=746811277| WSRT Stop day checklist and System Overview]]  
 +  *  ✔ [[https://support.astron.nl/jira/browse/ROADMT-923| Apertif NTP servers link cleanup]] (Jasmin) 
 +  * ✔ [[https://support.astron.nl/jira/browse/SDCH-3116| wop83 disk space expansion]] (Walter)
    
  
  
 Note: Note:
-  * Spacewalk VM (wop76) will be updated before stop-day (Walter+  * ✔ Uyuni VM (dop486) will be updated before stop-day (Jasmin
-  * Perform update of test systems: dop375, dop445, dop818, wop78 before the stop-day (Walter+  * ✔ Perform update of test systems: dop375, dop445, dop818, wop78 before the stop-day (Jasmin
-  * Perform update of test hypervisors: dop212, wop85 (ZFS/KVM) before the stop-day (Walter)+  * ✔ Perform update of test hypervisors: dop212, wop85 (ZFS/KVM) before the stop-day (Jasmin)
  
  

QR Code
QR Code public:stopdayactivities_121021 (generated for current page)