This is an old revision of the document!
Stop-day activities November 7, 2017
Coordinator | Reinoud Bokhorst | rbokhorst@astron.nl |
---|---|---|
Software Support | Arno Schoenmakers | softwaresupport@astron.nl |
Science, Operations and Support | Vanessa Moss | sos@astron.nl |
Observer | Henk Mulder | observer@astron.nl |
Planned end time: 15:00 LT (CET).
Systems
Cobalt
- ✔ Reboots and idrac reboots.
- ✔ Restart the Infiniband Switches
CEP3
- ✔ All nodes: file system check and reboot.
- ✔ Update scipy on ALL nodes to 0.19.1
CEP4
- ✘ Fix hosts file (postponed to 5 December)
- ✔/✘ Performance tests: ib perftest's, obdfilter-survey, lnet self-test, mdtest (partly done)
LEXARS
- Reboot
LCU
- ✘/✔ Reboots (only 7 were rebooted)
Central Services
- ✔ lcs116 upgrade & reboot
- ✔ Upgrade KNMI portal and geo portal to Ubuntu 14
- ✔ NFS server lcs115 reboot (169 days up)
LTA
Core switches
- ✔ warm reset of PD-0, RD-0 and RD-1. Scheduled for 11:00h
Software updates
MAC/SAS
- ✔ On LCU's: astropy-2.0.2, numpy-1.13.3, py-1.4.34, pytest-3.2.3
CEP3
- ✔ Activate LOFAR 3.0.0 (AS; Done)
- ✔ Install losoto 1.0.1 (AS; Done)
- ✔ Update scipy to 0.19.1 on all nodes (RB)
CEP4
- none
Aartfaac
- none
COBALT
- none
In the field
- Fan replacement on containers core stations.