This is an old revision of the document!
Stop-day activities September 5, 2017
Coordinator | Reinoud Bokhorst | rbokhorst@astron.nl Skype: astron_reinoud.bokhorst |
---|---|---|
Software Support | Jorrit Schaap | softwaresupport@astron.nl |
Science, Operations and Support | Sander ter Veen | sos@astron.nl |
Observer | Paul van Dijk | observer@astron.nl |
Planned end time: 15:00 LT (CET).
Systems
Cobalt
- √ Reboots and idrac reboots.
- √ Restart the Infiniband Switches.
CEP3
- √ All nodes: file system check and reboot.
CEP4
- √ Upgrade IB driver cpu[01-35] gpu[01-04]
- ✘ Fix hosts file
- ✘ Performance tests: obdfilter-survey
LEXARS
- ✘ Reboot
LCU
Central Services
- ✘ lcs116 upgrade & reboot
- √ Reboot MAC/SAS prod. Consult Arno (Uptimes: mcu001=140 days, ccu001=140, scu001=112, smu001=140, sas001=78, sas003=78) → done
- √ Reboot MAC/SAS test. Consult SDOS (Uptimes: mcu199=78, ccu199=112, scu199=19, smu199=140, sas099=106, sas199=196, ldb199=77)
- ✘ NFS server lcs115 reboot (169 days up)
LTA
Software updates
MAC/SAS
- √ Update WinCC from 3.14.6 to 3.14.12 → done
- √ Update rubidium_logger script to make it more robust against hanging
tci
calls. → done (except for de604c and ie613c)
CEP3
- Update PyBDSF to 1.8.12 → done
- Update CASA to 5.0.0 → done
CEP4
- none
Aartaac
- none