This is an old revision of the document!
Stop-day activities September 5, 2017
Coordinator | Reinoud Bokhorst | rbokhorst@astron.nl Skype: astron_reinoud.bokhorst |
---|---|---|
Software Support | Jorrit Schaap | softwaresupport@astron.nl |
Science, Operations and Support | Matthijs van der Wiel | sos@astron.nl |
Observer | Paul van Dijk | observer@astron.nl |
Planned end time: 15:00 LT (CET).
Systems
Cobalt
- reboots and idrac reboots.
- Restart the Infiniband Switches.
CEP3
- All nodes: file system check and reboot.
CEP4
- Upgrade IB driver cpu[01-35] gpu[01-04]
- Performance tests
LEXARS
- Reboot
LCU
Central Services
- lcs116 upgrade & reboot
- Reboot MAC/SAS prod. Consult Arno (Uptimes: mcu001=140 days, ccu001=140, scu001=112, smu001=140, sas001=78, sas003=78)
- Reboot MAC/SAS test. Consult SDOS (Uptimes: mcu199=78, ccu199=112, scu199=19, smu199=140, sas099=106, sas199=196, ldb199=77)
- NFS server lcs115 reboot (169 days up)
LTA
Software updates
MAC/SAS
- Update WinCC from 3.14.6 to 3.14.12
- Update rubidium_logger script to make it more robust against hanging
tci
calls.
CEP3
CEP4
- none
Aartaac
- none