This is an old revision of the document!
Stop-day activities Nov 1, 2016
Coordinated by Teun. Prefered end time 15:00.
Network
Arjen will swap ports of Cobalt node 8 to address the UDP packet loss.
Systems
No-Break
All equipment in rack D1 will be put on no-break power. STARTS AT 11:00 LT Involved machines:
1u ccu099 1u sas099 1u mcu099 1u lu ldb001 (powered off) 1u ldb002 1u 1u ldb003 1u lcs120 (Virtual machines: ccu002 kdcprod lcs158 mcu002 mcu005 mcu006 scu001 scu099 smu002) 1u lcs121 (Virtual machines: ccu199 kdctest lcs153 lcs155 lcs156 lcs157 mcu199) 1u lcs122 (Virtual machines sas199 1u 8u lse021 (powered off) 8u lse024 8u lexar001 8u lexar002 1u lfe001
cep2
- Swap locus095 and locus080 physically (Done by Kees)
Cobalt
- Reset idrac
- Reboot
CEP3
- Do a filesystem check on /data of lof001-022 (Done by Robin)
- Reboots
- lof022 reseat memory card
CEP4
- ?
Software updates
MAC/SAS
- Take into production by Arno: MCU002 (CentOS7)
- Take into production by Arno: CCU002 (CentOS7)
CEP2
- none
CEP3
- none
CEP4
- none