Differences
This shows you the differences between two versions of the page.
 
| Both sides previous revisionPrevious revisionNext revision | Previous revision | 
| intra:wp1:ca [2017/08/24 08:12]  –  meer | intra:wp1:ca [2018/06/22 12:13] (current)  –  tibbe | 
|---|
| ===== AENEAS Consortium Agreement (CA) ===== | ===== AENEAS Consortium Agreement (CA) ===== | 
 |  | 
| The AENAES CA {{:open:wp1:ca-731016-aeneas-final-2.pdf|ca-731016-aeneas-final-2.pdf}} was send for signatures to the partners on 14 February 2017. | The AENAES CA {{:open:wp1:ca-731016-aeneas-final-2.pdf|ca-731016-aeneas-final-2.pdf}} was sent for signatures to the partners on 14 February 2017. | 
 |  | 
| The {{:open:wp1:ca-731016-aeneas-final-2-signed-2.pdf|signed consortium agreement}} with two partners missing is available. | The {{:open:wp1:ca-731016-aeneas-final-2-signed-all.pdf|signed consortium agreement}} with all signatures is available since 21 December 2017. | 
 |  | 
| The final version with all signatures will be available here once all signatures have been collected. | After approval of the AENEAS General Assembly, CINECA (Italy) joined the AENEAS project on 18 June 2018 as an External Partner with INAF as the Sponsoring partner.  | 
|   | Signed CINECA AENEAS External Partner Request form: {{:intra:wp1:cineca_aeneas_external_partner_form_signed.pdf|}} | 
 |  | 
| ^  partner nr.^partner name^  signed  ^  date  ^ | ^  partner nr.^partner name^  signed  ^  date  ^ | 
| |  24| VUW |{{:open:wp1:red-man-symbol-th.png?7|}}  |last contact 2/6  (waiting for clarity on possible transition)| | |  24| VUW |  {{:open:wp1:man-with-ipad-green-th.png?10|}}| 18-12-2017 | | 
| |  28| RDA |  {{:open:wp1:man-with-ipad-green-th.png?10|}}| 17-08-2017 | | |  28| RDA |  {{:open:wp1:man-with-ipad-green-th.png?10|}}| 17-08-2017 | | 
| |  25| CSIR |  {{:open:wp1:man-with-ipad-green-th.png?10|}}| 13-04-2017 | | |  25| CSIR |  {{:open:wp1:man-with-ipad-green-th.png?10|}}| 13-04-2017 | |